| Name | Collection and Analysis of all relevant data by the Company(ies) responsible for the Survey, Design and Construction Materials Analysis |
| Description | The Company (ies) which undertakes the Survey, Design and Construction materials Analysis must x collect and analyze data and necessary construction materials for each type of construction project |
| Comments | - |
| Validity From | 26-11-2009 |
| Validity To | 31-12-9999 |
| Reference | Article 38 |
| Status | Active |
| Measure Type | Other measures |
| Agency Name | Ministry of Finance |
| Legal Document | Law On Construction No. 05/NA, dated 26 November 2009 |
|---|