Name | Construction Value Estimation and Development of detailed Action Plan by the Company(ies) responsible for the Survey, Design and Construction Materials Analysis |
Description | The Company (ies) which undertakes the Survey, Design and Construction materials Analysis must determine the use of construction materials, estimate the value of the construction and elaborate the detailed action plan |
Comments | - |
Validity From | 26-11-2009 |
Validity To | 31-12-9999 |
Reference | Article 38 |
Status | Active |
Measure Type | Administrative Requirements |
Agency Name | Ministry of Finance |
Legal Document | Law On Construction No. 05/NA, dated 26 November 2009 |
---|